Laserfiche WebLink
City/County:CITY OF EVERETT SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Hearing Date 7-1-9.7-. Pg 4 <br /> City No.: 0420 Adoption Date 7-./- <br /> County No.: 31 COLLECTOR ARTERIALS Resolution No. 34/7- <br /> 'F P PROJECT IDENTIFICATION m T C F PROJECT COSTS IN THOUSANDS OF DOLLARS IN THOUSANDS$ <br /> U r a 0 A U <br /> N I DESCRIPTION OF WORK jo work T L R N OBLIGATION TOTAL FUNDING SOURCE FEDERAL OBLIGATION PLAN <br /> C o f code A E R D SCHEDULE PLAN <br /> TC r (Street name or number, c (s) L N Y Y E A R FUNDS FEDERAL CAPP, FEDERAL <br /> NL i Co.road name or number, Iw G 0 S Local RAP, UTILITY AID FIRST 2ND <br /> LA t termini beginning&end. ao T V T 1st 2nd 3rd 4TH, Prog/Amt TIA, CODES PROJECT YEAR THRU <br /> S y Describe work to be done.) sr H E A 5TH, UATA NUMBER ANNUAL 6TH <br /> S No sk R T 6th Prog/Amt ELEMT. YEARS <br /> 1 2 3 4 5 _ 6 7 8 9 10 11_ 12 13 14 15 16 17 18 19 20 <br /> 17 1 75TH STREET 2 ABDF 0.8 P 340 1360 1700 340 1360 CPT 2784 P.E. <br /> BEVERLY BLVD-BEVERLY LANE GHIJK R/W <br /> STREET WIDENING CONST <br /> PROPOSED DATA PROJECT TOTAL <br /> 17 2 7TH AVENUE S.E. 2 U 0.9 * U 301 I I I 30 1 301 I 1 I 2599 P.E. <br /> EVERETT MALL WAY-CASINO ROAD R/VW <br /> DESIGN STUDY CONST <br /> TOTAL <br /> P.E. <br /> R/W <br /> CONST <br /> TOTAL <br /> P.E. <br /> R/W <br /> CONST <br /> TOTAL <br /> P.E. <br /> R/W , <br /> CONST <br /> TOTAL <br /> P.E. <br /> R/W <br /> CONST <br /> TOTAL <br /> P.E. <br /> R/W <br /> CONST <br /> ;TOTAL <br /> P.E. <br /> R/W <br /> CONST <br /> TOTAL <br />