My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3642
>
Resolutions
>
Resolution 3642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 11:24:00 AM
Creation date
4/20/2017 11:23:47 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3642
Date
7/1/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City/County:CITY OF EVERETT SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Hearing Date 7-/-9,4 Pg 3 <br /> City No.: 0420 <br /> Adoption Date 7-/-9L <br /> County No.: 31 MINOR ARTERIALS Resolution No.._39,4z., <br /> .F P PROJECT IDENTIFICATION m T C F PROJECT COSTS IN THOUSANDS OF DOLLARS IN THOUSANDS$ <br /> U r a 0 A U <br /> N I DESCRIPTION OF WORK jo work T L R N OBLIGATION TOTAL FUNDING SOURCE FEDERAL OBLIGATION PLAN' <br /> C 0 f code A E R D SCHEDULE PLAN <br /> TC r (Street name or number, c (s) L N Y Y E A R FUNDS FEDERAL CAPP, FEDERAL <br /> NL i Co.road name or number, Iw G 0 S Local RAP, UTILITY AID FIRST 2ND <br /> LA t termini beginning&end. ao T V T 1st 2nd 3rd 4TH, Prog/Amt TIA, CODES PROJECT• YEAR THRU <br /> • <br /> S y Describe work to be done.) sr H E A 5TH, UATA NUMBER ANNUAL 6TH <br /> S No sk R T 6th Prog/Amt ELEMT. YEARS <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 <br /> 16 1 112TH STREET S.E. 2 ABDF 3.5 * F 100 900 15000 16000 2200 13800 CPTO 2588 P.E. <br /> INTERSTATE 5-SR 525 GHJK RAN <br /> ENVIRONMENTAL REVIEW; 'CONST •, <br /> DESIGN&CONSTRUCT ROADWAY IMPROVEMENTS _ _ TIB PROJECT;EVERETT/SNOHOMISH COUNTY JOINT PROJECT TOTAL <br /> 16 2 41ST RUCKER&BROADWAY 3 ABDF 0.5 * U 1150 I I I I 1150 I 450 I f 700'PTO I 2797 P.E. <br /> WESTBOUND&EASTBOUND THROUGH LANES; R/W <br /> SIGNAL IMPROVEMENTS CONST <br /> _ - WASHINGTON STATE LEGISLATIVE FUNDS TOTAL <br /> 16 3 4TH AVENUE WEST 2 ABCD 0.5 * P 932 I 933 I I I 1865 I 700 I I 1165 ICPTG I 2597 P.E. . <br /> CASINO ROAD-HOLLY DRIVE R/W <br /> ROADWAY IMPROVEMENTS CONST <br /> PROPOSED UATA PROJECT;EVERETT LEAD W/SNOHOMISH COUNTY TOTAL . <br /> 16 4 MADISON AVENUE 6 HJ 1 * P I 1000 I 1 1 1000 I 1000 I I I I 2780 P.E. <br /> SIEVERS-DUECY BLVD.TO BROADWAY R/W <br /> ROADWAY&SIGNAL IMPROVEMENTS CONST <br /> TOTAL <br /> 16 5 SEAWAY BLVD 2 ABDF 2 * F I I 2000 I I 2000 I 2000 I I ICPTG I 2781 '.E. , <br /> 75TH-36TH STREET H RPM <br /> DESIGN&CONSTRUCT ROADWAY WIDENING ,CONST <br /> TOTAL <br /> P.E. <br /> RAN <br /> CONST <br /> TOTAL <br /> P.E. ' <br /> R/W <br /> CONST <br /> TOTAL <br /> . '.E. <br /> RAN <br /> CONST <br /> 'TOTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.