My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/06/09 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/06/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 9:47:21 AM
Creation date
4/21/2017 9:45:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/9/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Exh €bit . <br /> New Section to be added to the B-3 Zone <br /> 19.22.030 Use of Basement or Other Building Spaces. <br /> A. Purpose. The purpose of this section is to allow basements or other spaces in existing <br /> buildings in the B-3 zone to be considered for uses that are not otherwise permitted, but <br /> which, if properly designed and managed, would not create unacceptable impacts on <br /> surrounding properties or the downtown area in general. Other spaces, in addition to <br /> basements in existing buildings that, due to their location or configuration are not <br /> readily usable for permitted uses, as determined by the Planning Director, maybe <br /> considered using the process described herein. This process differs from the Unlisted <br /> Use process listed in EMC 19.02.080 in that uses that are not specifically authorized in <br /> the B-3 zone may be considered using the process described herein. <br /> B. Review Process. Any request to allow a use that is not otherwise permitted in the 8-3 <br /> zone shall be reviewed using Review Process II. <br /> C. Review Criteria.. The following criteria shall be used as the basis for approving, denying, <br /> or conditionally approving a request to allow the use of a basement space, or other <br /> space as provided herein,for a use not otherwise permitted in the B-3 zone. Any <br /> proposal that gives the outward appearance of a use or activity that is incompatible with <br /> the intent and purpose of the B-3 zone shall be denied. <br /> 1. traffic generated by the proposed use <br /> 2. noise generated by the proposed use <br /> 3. impacts from odor, vibration, dust or other nuisances <br /> 4. aesthetic character and quality of the proposed use <br /> 5. public safety impacts <br /> 6. compliance with building and fire codes <br /> 7. hours of the day of proposed use or activity <br /> 8. proposed management and operational procedures to minimize and mitigate <br /> potential impacts <br /> 9. other factors not specified herein that would create a conflict with the uses that <br /> are permitted in the B-3 zone. <br /> 3 <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.