<br /> BID TABULATION
<br /> Sewer System Replacement"F"Schedule B
<br /> W.O.#UP3300-2
<br /> Date 6/30/2010
<br /> Schedule 2. WATER SYSTEM
<br /> Prepared By:William Barrett ,
<br /> Buno Construction Titan Earthworly LLC HOS Brothers Const. Interwest Construction,Inc New West Development
<br /> For:Dave Voigt,Project Engineer ENGINEER'S ESTIMATE
<br /> TOTAL UNIT TOTAL UNIT TOTAL UNIT
<br /> TOTAL UNIT TOTAL
<br /> ITEM UNIT TOTAL UNIT AMOUNT PRICE AMOUNT
<br /> 0 ITEM DESCRIPTION UNIT QUANTITI' PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE
<br /> 75 Ductile Iron Pipe for Water Main, LF 697 $114.00 579,458.00 565.00 $45,305.00 550.00 534,850.00 1117.00 581,549.00 - 575.00 552,275.00 582.00 557,154.00
<br /> B Inch
<br /> 000.00 $1,000.00 510,000.00 SI,200.00 112,000.00
<br /> 76 Replace Existing Water Service, EA 10 2600.00 56,000.00 51,200.00 512,000.00 51,600.00 516,000:00 5800.00 58,
<br /> 3/4 Inch600.00 21,900.00 55,700.00
<br /> 77 Replace Existing Water Service, EA 3 11,200.00 53,600.00 51,500.00 54,500.00 11,600.00 54,800.00 51,700.00 55,100.00 51,200.00 $3,
<br /> 3/4 Inch with Sleeve565,875.00 574,834.00
<br /> 561,805.00 $55,650.00 594,649.00
<br /> Schedule I Subtotals 589,058.00 56,060.50 56,886.57
<br /> 55,686.06 55,119.80 58,707.71 '
<br /> WA Salo Tax 58,193.34 571,935.50 581,740.57
<br /> Contract Totals: 597,251.34
<br /> 567,491.06 560,769.80 5103,336.71