Laserfiche WebLink
C") <br /> BID TABULATION <br /> Sewer System Replacement"F"Schedule B <br /> W.O.#UP3300-2 <br /> Date 6/30/2010 <br /> Schedule 2. WATER SYSTEM <br /> Prepared By:William Barrett , <br /> Buno Construction Titan Earthworly LLC HOS Brothers Const. Interwest Construction,Inc New West Development <br /> For:Dave Voigt,Project Engineer ENGINEER'S ESTIMATE <br /> TOTAL UNIT TOTAL UNIT TOTAL UNIT <br /> TOTAL UNIT TOTAL <br /> ITEM UNIT TOTAL UNIT AMOUNT PRICE AMOUNT <br /> 0 ITEM DESCRIPTION UNIT QUANTITI' PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE <br /> 75 Ductile Iron Pipe for Water Main, LF 697 $114.00 579,458.00 565.00 $45,305.00 550.00 534,850.00 1117.00 581,549.00 - 575.00 552,275.00 582.00 557,154.00 <br /> B Inch <br /> 000.00 $1,000.00 510,000.00 SI,200.00 112,000.00 <br /> 76 Replace Existing Water Service, EA 10 2600.00 56,000.00 51,200.00 512,000.00 51,600.00 516,000:00 5800.00 58, <br /> 3/4 Inch600.00 21,900.00 55,700.00 <br /> 77 Replace Existing Water Service, EA 3 11,200.00 53,600.00 51,500.00 54,500.00 11,600.00 54,800.00 51,700.00 55,100.00 51,200.00 $3, <br /> 3/4 Inch with Sleeve565,875.00 574,834.00 <br /> 561,805.00 $55,650.00 594,649.00 <br /> Schedule I Subtotals 589,058.00 56,060.50 56,886.57 <br /> 55,686.06 55,119.80 58,707.71 ' <br /> WA Salo Tax 58,193.34 571,935.50 581,740.57 <br /> Contract Totals: 597,251.34 <br /> 567,491.06 560,769.80 5103,336.71 <br /> r--1 <br />