BID TABULATION
<br /> Sewer System Replacement"F"Schedule B
<br /> W.O.#UP3300-2
<br /> Date 6/30/2010
<br /> Schedule 2 ,WATER SYSTIT(
<br /> Prepared By:William Barrett
<br /> For:Dave Voigt Project Engineer ENGINEER'S ESTIMATE KLB Construction SCI Infrastructure G.G.Excavation,Inc. Mountain West Construction Plats Plus,Inc
<br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> 6 ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br /> 75 Ductile Iron Pipe for Water Main, LF 697 5114.00 579,458.00 550.00 534,850.00 573.70 551,368.90 531.85 522,199.45 551.30 535,756.10 554.00 537,638.00
<br /> 8 Inch
<br /> 76 Replace Existing Water Service, EA 10 5600.00 56,000.00 5800.00 58,000.00 5850.00 58,500.00 51,119.03 511,190.30 5732.00 57,320.00 5575.00 55,750.00
<br /> 3/4 Inch 5900.00 52,700.00
<br /> 77 Replace Existing Water Soria, EA 3 51,200.00 53,600.00 52,000.00 56,000.00 51,375.00 54,125.00 51,270.98 53,012.94 5755.00 52,2
<br /> 3/4 Inch with Sleeve
<br /> ,Schedule I Subtotals 589,058.00 548,850.00 563,993.90 537,202.69 545,341.10 546,000.00
<br /> WA Sales Tax 58,19334 54,494.20 55,887.44 53,422.65 ' 54,171.38 54,240.10
<br /> Contract Totals: 59715134 553,344.20 569,88134 540,625.34 549,512.48 550,328.10