Interwest Construction,Inc. Page 1 <br /> 10-081 Hoyt Ave 07/07/2010 14:45 <br /> Phil Navert DIRECT COST REPORT <br /> Activity Desc Quantity Unit Penn Constr Equip Sub- <br /> Resource Pcs Unit Cost Labor Material Matl/Exp Ment Contract Total <br /> BID ITEM = 230 <br /> Description= Cleaning and Painting Existing Metal Can Unit= LS Takeoff Quan: 1.000 Engr Quan: 1.000 <br /> .I.LT:`: eiLi.!i4i}4LTIi`oil�`l'i'tililCia._aS'f_.IlYIS_����,�'(stcti.L _^''i.__ ,_ ,.Vait7! _:_ ..414I lE3_ l_t,t'1/41iiis•:">.'&1 J+. .LfY�. 3:e,Y.�P��`tti213-_,. -Paint canopy at trellus <br /> L213 2 laborer/backhoe 16.00 CH Prod: 0.0625 UH Lab Pcs: 3.00 Eqp Pcs: 2.00 <br /> 2 MATERIA S®.109.2% 1.00 LS 1,250.000 1,365 1,365 <br /> 8B1-15805M CASE 580 Super M Backh 1.00•- 16.00 HR- - . , 30.000 - - 480 480 <br /> 8LT1 1 Ton - 1.00 16.00 HR 20.000 320 320 <br /> LG Laborer-General 2.00 32.00 MH 30.960 1,479 1,479 <br /> OE Operator-Equipment 1.00 16.00 MH 34.750 906 906 <br /> $4,550.23 48.0000 MH/LS 48.00 MH [1546.72] 2,385 1,365 800 4,550 <br /> ---4- item Totals: 230 - Cleaning and Painting Existing Metal Can <br /> $4,550.23 48.0000 MH/IS 48.00 MH [1546.72] 2,385 1,365 800 4,550 <br /> 4,550.230 1 LS 2,385.23 1,365.00 800.00 4,550.23 <br /> $4,550.23 *** Report Totals *** 48.00 MH 2,385 1,365 800 4,550 <br /> >>>Indicates Non Additive Activity <br /> I —Report Notes:----- <br /> The estimate was prepared with TAKEOFF Quantities. <br /> This report shows TAKEOFF Quantities with the resources. <br /> Bid Date: Owner: Engineering Finn: <br /> Estimator-In-Charge: <br /> JOB NOTES <br /> Estimate created on: 07/01/2010 by User*: 1 - Phil Navert <br /> Source estimate used: H:\HEAVYBID\EST\ESTMAST <br /> *on units of NH indicate average labor unit cost was used rather than base rate. <br /> [ ]in the Unit Cost Column=Labor Unit Cost Without Labor Burdens <br /> In equipment resources, rent % and EOE % not = 100% are represented as XXX%YYY where XXX=Rent% and YYY=EOE% <br /> ---Calendar Codes-- <br /> Calendars are found in crew and labor codes and have the format XXXdY where <br /> XXX=The Calendar and Y=The Starting Day of the Week with Day 1=Monday,etc. <br /> 410 Four 10-Hour Shifts <br /> 5-8 Five 8-Hour Days <br /> 510 Five 10-Hour.Days <br />