Laserfiche WebLink
Interwest Construction,Inc. Page 1 <br /> 10-081 Hoyt Ave 07/07/2010 14:45 <br /> Phil Navert DIRECT COST REPORT <br /> Activity Desc Quantity Unit Penn Constr Equip Sub- <br /> Resource Pcs Unit Cost Labor Material Matl/Exp Ment Contract Total <br /> BID ITEM = 610 <br /> Description= Trellis Colum Window Wall and Vine Suppo Unit= LS Takeoff Quan: 1.000 Engr Quan: 1.000 <br /> I::: - <br /> ` 1idark`"$ i'LiT_i i ,5iriiitilffv�°'f1J(t.or\,,:iii `�.f til' x9.Willt" _�_'al.liit( ).t3Jib._l`(r.= tial ,,(�. 3-;,1:3,\° 'ia�. 6 a <br /> Sheet LS9, At Planter trellus, connect to canopy. <br /> L2B 2 laborer/backhoe 48.00 CH Prod: 0.0208 UN Lab Pcs: 3.00 Eqp Pcs: 2.00 <br /> 2 MATERIALS@109.2% 1.00 LS 7,500.000 8,190 8,190 <br /> 8BH58OSM CASE 580 Super M Backh 1.00 48.00 HR 30.000 1,440 . 1,440 <br /> 8LT1 1 Ton 1.00 48.00 HR 20.000 960 960 <br /> LG Laborer-General 2.00 96.00 MIL 30.960 4,437 4,437 <br /> OE Operator-Equipment 1.00 48.00 MH 34.750 2,719 2,719 <br /> $17,745.70 144.0000 Mil/LS 144.00 MH [4640.16] 7,156 8,190 2,400 17,746 <br /> —> Item Totals: 610 - Trellis Colum Window Wall and Vine Suppo <br /> $17,745.70 144.0000 MI-I/IS 144.00 MH [4640.16] 7,156 8,190 2400 17,746 <br /> 17,745.700 1 LS 7,155.70 8,190.00 2,400.00 17,745.70 <br /> $17,745.70 *** Report Totals *** 144.00 MH 7,156 8,190 2,400 17,746 <br /> >>>indicates Non Additive Activity <br /> ----Report Notes:---- <br /> The estimate was prepared with TAKEOFF Quantities. <br /> This report shows TAKEOFF Quantities with the resources. <br /> Bid Date: Owner: Engineering Firm: <br /> Estimator-In-Charge: <br /> JOB NOTES <br /> Estimate created on: 07/01/2010 by UserlI: 1 - Phil Navert <br /> I Source estimate used: H:\HEAVYBID\EST\ESTMAST <br /> *on units of MH indicate average labor unit cost was used rather than base rate. <br /> [ ]in the Unit Cost Column=Labor Unit Cost Without Labor Burdens <br /> In equipment resources, rent % and EOE % not = 100% are represented as XXX%YYY where XXX=Rent% and YYY=EOE% <br /> —Calendar Codes--- <br /> Calendars are found in crew and labor codes and have the format XXXdY where <br /> XXX=The Calendar and Y=The Starting Day of the Week with Day 1=Monday,etc. <br /> 410 Four 10-Hour Shifts <br /> 5-8 Five 8-Hour Days <br /> 510 Five 10-Hour Days <br />