Laserfiche WebLink
4 <br /> EXHIBIT A-2 <br /> SCOPE OF WORK <br /> SCOPE OF WORK NAKANO ASSOCIATES <br /> EVERETT PERFORMING ARTS PLAZA <br /> DESIGN AND CONSTRUCTION DOCUMENTS <br /> Project Restart—Revised Design Development Phase <br /> All work to prepare revised and updated final design including but not limited to the following: <br /> - Staff meetings <br /> - Public meetings <br /> - Schematic plan <br /> - Plan development <br /> - Details <br /> - Project artist coordination of integrated plaza design elements <br /> - Structural sections of fountain including material details,water wall sections& <br /> elevations,fountain piping diagrams,fountain facing material details, layout/drainage <br /> and utilities plan <br /> Prepare street/drainage details. <br /> Prepare lighting&electrical plans and lighting&electrical details. <br /> Prepare grading plan,planting plans, irrigation plan,hardscape and landscape details and <br /> specifications. <br /> Prepare final specifications. <br /> Prepare construction cost estimates. <br /> Present to Mayor, City Council and to Community. <br /> Design Development and Construction Documents/Administration Resulting from Utilities <br /> Undergrounding <br /> All work, including on site meetings with utility providers,to incorporate into the project <br /> electrical documents the utilities' designs for underground conduit and vaults/handholes to <br /> underground the existing overhead utilities. <br /> 44 <br />