My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/08/04 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/08/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 9:40:11 AM
Creation date
4/24/2017 9:38:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/4/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Coordination with the utility providers to correctly detail their underground infrastructure <br /> designs. <br /> Design of power and communications conduits routing from the utilities'vaults to the east <br /> exterior wall of the Colby Street businesses that are to receive redesigned utility service conduits; <br /> design of conduit risers up the exterior wall of the Colby Street businesses. <br /> One site visit to observe construction progress;review material submittals;answer contractor <br /> questions and requests for information(BFI's). <br /> Construction Documents Phase <br /> Prepare all construction plans,bidding documents and details for plaza project including but not <br /> limited to the following: <br /> - Demolition plan <br /> - Fountain details <br /> - Structural details for plaza,steps and walls <br /> - Paving plans <br /> - Utilities plan <br /> - Lighting plan <br /> - Integrated plaza design elements and estimate <br /> - Undergrounding of utilities and provision of utility infrastructure not provided by <br /> PUD. <br /> • <br /> Bidding Phase <br /> Attend Pre-Bidding Conference,answer contractor's questions,prepare bid addenda and review <br /> bids. <br /> 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.