Laserfiche WebLink
4 <br /> Coordination with the utility providers to correctly detail their underground infrastructure <br /> designs. <br /> Design of power and communications conduits routing from the utilities'vaults to the east <br /> exterior wall of the Colby Street businesses that are to receive redesigned utility service conduits; <br /> design of conduit risers up the exterior wall of the Colby Street businesses. <br /> One site visit to observe construction progress;review material submittals;answer contractor <br /> questions and requests for information(BFI's). <br /> Construction Documents Phase <br /> Prepare all construction plans,bidding documents and details for plaza project including but not <br /> limited to the following: <br /> - Demolition plan <br /> - Fountain details <br /> - Structural details for plaza,steps and walls <br /> - Paving plans <br /> - Utilities plan <br /> - Lighting plan <br /> - Integrated plaza design elements and estimate <br /> - Undergrounding of utilities and provision of utility infrastructure not provided by <br /> PUD. <br /> • <br /> Bidding Phase <br /> Attend Pre-Bidding Conference,answer contractor's questions,prepare bid addenda and review <br /> bids. <br /> 45 <br />