Laserfiche WebLink
Project: Sewer F Schedule A Project <br /> Change Order No. 4 1 <br /> Change Order Effective Date: June 23, 2010 <br /> Bid Item#102—MOH—30" HDPE Pipe. This bid item is created to pay for the materials on hand <br /> costs of one 50' piece of 30"HDPE pipe originally required and delivered to the jobsite, but never <br /> used on the project, due to design changes. <br /> CONTRACT TIME: No additional working days are being added to the contract time <br /> by change order#4. <br /> • <br /> Page 4 of 4 5 <br />