Laserfiche WebLink
1. <br /> Sheet 1 of 2 CITY OF EVERETT Contract No. 33001 <br /> Public Works Department <br /> Date: 6/23/10 CHANGE ORDER ESTIMATE Change Order No. 4 <br /> Old New Unit Unit Estimated Estimated <br /> Item Item Description of Price Quantity Amount of <br /> No. No. Measure Change Change <br /> Traffic Control Labor <br /> 2 HR $47.50 (1,052.00) ($49,970.00) <br /> Sawcut Pavement <br /> 4 LF $2.00 (3,784.00) ($7,568.00) <br /> Sawcut Pavement,Additional <br /> 5 1-Inch Thickness LF $0.30 (2,965.00) ($889.50) <br /> Control Density Fill <br /> 7 CY $90.00 (113.00) ($10,170.00) <br /> HMA CL 1/2-inch PG 64-22 <br /> 8 TON $120.00 227.42 $27,290.40 <br /> Asphalt Treated Base <br /> 9 TON $101.00 35.10 $3,545.10 <br /> 10 Pavement Patch (Temp) TON $175.00 (102.99) ($18,023.25) <br /> Concrete Inlet <br /> 21 EACH $950.00 (3.00) ($2,850.00) <br /> Catch Basin Type B with Gas <br /> 22 Trap EACH $1,600.00 2.00 $3,200.00 <br /> Combined Sewer Pipe,36-inch <br /> 25 PS-46 PVC LF $221.00 (14.00) ($3,094.00) <br /> Combined Sewer Pipe,24- <br /> 27 inch, PS-46 PVC LF $227.00 (3.00) ($681.00) <br /> Combined Sewer&Storm <br /> 28 Sewer Pipe, 12"SDR 35 PVC LF $100.25 28.00 $2,807.00 <br /> Combined Sewer&Storm <br /> 30 Sewer Pipe,8" SDR 35 PVC LF $92.00 (309.00) ($28,428.00) <br /> Combined Sewer Pipe, 30- <br /> 31 inch SDR 17 HDPE LF $342.45 11.00 $3,766.95 <br /> Combined Sewer Pipe, 24-inch <br /> 32 SDR 17 HDPE LF $136.00 (9.00) ($1,224.00) <br /> Combined Sewr Pipe, 24-inch <br /> 33 SDR 17 HDPE,Owner LF $63.00 (5.00) ($315.00) <br /> Combined Sewer Pipe, 12-inch <br /> 34 SDR 17 HDPE LF $80.00 32.00 $2,560.00 <br /> Combined Sewer Pipe, 12-inch <br /> 35 Class 53 DI Pipe LF $388.00 (35.00) ($13,580.00) <br /> Summary of dollars sheet1 of <br /> 2 ($93,623.30) <br /> 6 <br />