My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/08/25 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/08/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 10:32:37 AM
Creation date
4/24/2017 10:32:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET ,; <br /> PROJECT TITLE: <br /> GCA 6541 with Washington Consent COUNCIL BILL # <br /> State Department of Action Originating Department Public Works <br /> Transportation for US 2: First Reading Contact Person Richard Tarry <br /> Everett Port/Naval Station to Second Reading Phone Number (425)-257-8922 <br /> SR 9 Corridor Planning Study Third Reading FOR AGENDA OF <br /> Funding Public Hearing <br /> Proposed Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> City of Everett, US 2 4/14/09 Transportation GCA 6541 Legal <br /> 4/19/09 Governmental <br /> Affairs <br /> Amount Budgeted $0.00 <br /> Expenditure Required $200,000.00 Account Number(s): PW3436 <br /> Budget Remaining N/A <br /> Additional Required $200,000.00 From CIP 3 <br /> DETAILED SUMMARY STATEMENT: <br /> The 2009 Washington State Legislature provided the Washington State Department of Transportation <br /> (WSDOT)with$400,000 to conduct the US 2: Everett Port/Naval Station to SR 9 Corridor Planning Study. <br /> The total budget for the study is $800,000. The funding partnership for the study includes WSDOT, <br /> Snohomish County, and the City. The City is contributing up to $200,000, from CIP 3, to fund the study. <br /> The intent of the corridor plan is to identify a range of mobility improvements that can be implemented over <br /> the next 20 years, as funding becomes available. A prioritized list of low,medium, and high cost <br /> improvements will be produced. The recommended improvements and strategies will provide a long range <br /> vision for the corridor which can be implemented incrementally using a variety of federal, state, and local <br /> funding sources. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign GCA 6541 with Washington State Department of Transportation for US 2: <br /> Everett Port/Naval Station to SR 9 Corridor Planning Study Funding. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.