Laserfiche WebLink
Scope of Services <br /> Continued <br /> h. Stormwater detention improvements by installing outlet flow restrictors in catch <br /> basins around Legion Memorial Golf Course,with the intent to pond stormwater <br /> in the golf course area during extreme storms and to convey some surface runoff <br /> in street gutters and alleys. <br /> i. Compare Alternative Solutions developed in Tasks 3.a through 3.h and identify <br /> those alternatives appearing to be the better candidate solutions.Prepare a <br /> concept sketch, description, facility sizing and preliminary opinion of project cost <br /> for the three candidate solutions appearing to be most feasible. Prioritize the <br /> potential projects in terms of benefit versus cost. <br /> 4. Technical Report <br /> a. Prepare a brief technical report for submittal to the City summarizing the results <br /> of Phase 2 modeling <br /> City of Everett—North Everett Combined Sewer System Evaluation 8 <br /> otak <br /> IC:\project\31500\31520\Contract\Arnendll_NAreaFlooding\31520 Everett Sewer Amendment 1 Scope082510.doc <br /> 10 <br />