My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3493
>
Resolutions
>
Resolution 3493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 10:41:15 AM
Creation date
4/25/2017 10:41:11 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3493
Date
7/3/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00110 <br /> FORM OF PROPOSAL <br /> EXHIBIT "A" <br /> B. ALTERNATE BIDS AND UNIT PRICE BIDS <br /> None. <br /> C. OFF-SITE PARKING <br /> The undersigned has secured the lease rights for the daytime and nighttime <br /> parking requirements in sufficient quantities and duration of lease. Copies of <br /> notarized Lease Agreements are enclosed herewith as part of this Proposal. <br /> D. SALES TAX <br /> Sales tax shall be included in the amount proposed for the Lease Purchase <br /> Principal Component. The amount of sales tax required (in addition to the <br /> amount shown on page 1) for this project shall be (7.9%) $793,444.48 <br /> E. REINSTATEMENT OF ALTERNATE BIDS <br /> Not applicable. <br /> F. TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> The Undersigned agrees, if awarded the Contract, to complete the work under <br /> the Contract as specified in Section 01350 - MAJOR MILESTONE SCHEDULE, <br /> and also agrees to the amounts specified for Liquidated Damages. It is further <br /> agreed that the time for completion of the work described herein is a reasonable <br /> time considering the average climatic range and usual conditions prevailing in <br /> the locality. <br /> G. PRINCIPAL DESIGN PROFESSIONALS, GENERAL CONTRACTOR AND <br /> SUBCONTRACTORS <br /> Principal Design Professionals, General Contractor and Subcontractors shall be <br /> as proposed in the Statement of Qualifications. <br /> x Yes No <br /> If the answer is "NO," attach a separate sheet, state the substitution and reasons <br /> and reasons for the substitution. <br /> H. TRENCH EXCAVATION SAFETY PROVISIONS <br /> If the Contract contains any work which requires trenching exceeding a depth of <br /> four (4) feet, all costs for adequate trench safety systems shall be identified as a <br /> separate item in compliance with Chapter 39.04 RCW. The purpose of this <br /> provision is to ensure that the Proposal agrees to comply with all the relevant <br /> trench safety requirements of Chapter 49.17 RCW. This amount shall be <br /> considered as part of the total Lease Purchase Principal Component set forth <br /> above. If the trench excavation safety provisions do not pertain to the project, <br /> put N.A. for the dollar amount. <br /> Trench Excavation Safety Provisions only: <br /> • <br /> $ N/A <br /> (written out) <br /> $ N/A (in figures) <br /> (5kInitials of Proposer's Representative <br /> ORB 9036 Page 3 <br /> bap 03/14/91-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.