My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/10/20 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/10/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:02:01 AM
Creation date
4/26/2017 9:01:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> and is subject to approval of future amendments. Building permit application for Group 2 <br /> program is not included. <br /> 5. LEEDTM Process is not included at this time, however sustainable building practices will <br /> be incorporated into site and building design as program and budget allow. <br /> DESIGN STANDARDS/CRITERIA <br /> 1. City of Everett drawing standards, ACAD 2009, Civil 3D 2009 (converting to LDD as <br /> required for coordination with others), or as agreed. <br /> 2. Specification format for Group 2 50% submittal is CSI with only technical portions <br /> prepared by the design team and/or reviewed in coordination with Group 2. <br /> 3. City of Everett, Design and Construction Standards and Specifications for Development, <br /> current edition. <br /> 4. City of Everett, Stormwater Management Manual, current edition. <br /> 5. City of Everett, Water and Sewer Design Standards, current edition. <br /> 6. WADOE, 2005 Stormwater Management Manual for Western Washington. <br /> 7. WSDOT, Standard Specifications for Road, Bridge, and Municipal Construction, English, <br /> current edition and Amendments. <br /> SCHEDULE <br /> The scope of work is premised on a Notice-to-Proceed date of October 2010. Schedule for <br /> completion of individual work tasks will be coordinated with milestones for completion of CITY <br /> and Developer tasks. <br /> Tentative schedule as follows: <br /> • Advance documentation toward 60% PS&E for Early Phase Projects for January 2011 <br /> review and updated schedule. <br /> • 60% PS&E for Bigelow Creek Subbasin Stormwater Retrofit January 2011 (permit <br /> review/comment schedule dependant). <br /> • 50% PS&E for 3-Acre Park and Railroad Corridor Preliminary Grading, Drainage, and <br /> Planting November/December 2010. <br /> DELIVERABLES <br /> Deliverables will be provided as noted herein and as described in detail in individual Task Order <br /> Documents. <br /> TASKS <br /> 000. GEC Management <br /> 0.1 Coordination and Review: Coordinate the CONSULTANT design team to ensure that <br /> the work is completed on schedule, is technically competent, and meets the CITY's <br /> requirements. Develop and implement the work plan and provide overall coordination <br /> and review of the work. Organize and administer regular internal coordination meetings <br /> of the design team to facilitate execution of the work. <br /> 0.2 Document Management: Provide for the management of drawings and documents <br /> received and generated over the course of the project, including review, distribution, <br /> filing, and storage. <br /> 0.3 Project Schedule: The CITY has established the overall project schedule that <br /> coordinates with other Consultant design teams and the Developer. A detailed schedule <br /> for the CONSULTANT work elements shall be prepared, integrated with the known <br /> schedules of others, and updated by the CONSULTANT, with input from the CITY. <br /> 11 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.