temporary seeding/planting and final planting where construction sequence allows. The <br /> documents will be developed in the following sequence: 50% submittal consisting of <br /> drawings, preliminary bid schedule, specifications table of contents, updated cost <br /> estimate. Subsequent submittals including 90% submittal consisting of drawings, bid <br /> schedule, specifications, updated cost estimate; and 100% submittal consisting of <br /> drawings, bid schedule, specifications, engineers construction cost estimate are not <br /> included in the scope at this time and are subject to approval of future amendments. The <br /> format of deliverables and schedule for submittal will be in conformance with that <br /> required of Group 2.in their contract with the CITY. <br /> Deliverables: 1) 50% PS&E documents. <br /> 16 8 <br />