My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/11/03 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/11/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:41:08 AM
Creation date
4/26/2017 9:39:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Exhibit A <br /> Scope of Work <br /> Engineering Services <br /> City of Everett <br /> Water Main Replacement "K" <br /> Lowell Area and Lago da Plata East Water Main Loop <br /> UP No. 3443 <br /> Roth Hill, LLC <br /> I. Project Description and Purpose <br /> The City plans to replace and abandon in-place existing cast iron pipe in two general project <br /> locations, the Lowell service area and near the Lago da Plata mobile home park. <br /> The Lowell area of the project is generally bounded by 41St Street to the North, Ravenna Street <br /> to the South, South 4th Avenue to the West, and South 2nd Avenue to the East. The new mains <br /> are expected to consist of approximately 9,000 lineal feet of 8-inch and 12-inch diameter ductile <br /> iron water main (sizes to be confirmed during design). A large portion of the cast iron mains <br /> being replaced by this project were constructed in the 1920's and are beyond their service life. <br /> The work in this area will also include installation of a new PRV station in a concrete vault, <br /> valves, fire hydrants, water service lines (from mains to the shut off at the meter boxes), new <br /> water meter boxes and setters, related appurtenances and surface restoration. <br /> The Lago da Plata area of the project will include the replacement of approximately 1,900 lineal <br /> feet of 8-inch diameter cast iron water main constructed in 1961 with new 12-inch diameter <br /> ductile iron water main. The main replacement will extend from 112th Street SE to the Silver <br /> Lake Water District metering station, and will be installed just to the east of the mobile home <br /> park in PUD property within an existing City of Everett easement. The work in this area will also <br /> include the installation of valves, related appurtenances as needed and surface restoration. <br /> II. Scope of Work &Tasks <br /> Roth Hill will provide the consulting engineering &survey services necessary to design the <br /> proposed water main, and provide support with permitting and construction. The specific <br /> elements of Roth Hill's Scope of Work are itemized and presented in the following tasks: <br /> A. Project Management <br /> 1. Manage and coordinate with subconsultants, ensuring delivery timetables are <br /> met. <br /> 2. Manage internal staff to meet project goals, budget, and delivery timetables. <br /> 3. Develop and maintain project design schedule in Microsoft Project, with tasks <br /> and milestones clearly identified. <br /> 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.