My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/11/03 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/11/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:41:08 AM
Creation date
4/26/2017 9:39:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K October 5, 2010 <br /> UP No. 3443 Page 6 of 9 f 5 <br /> H. 90% Design <br /> 1. Prepare 90% Design Drawings, incorporating City review comments from 60% <br /> Design stage. Provide complete set including cover sheet, sheet index, plans <br /> and profiles, and details (Estimated at 32 sheets). Complete construction notes <br /> and call-outs and sheet numbering. <br /> 2. Prepare 90% Specifications, incorporating City review comments from 60% <br /> Design stage. Provide complete contract document including all appendices, <br /> permits obtained, permit applications (if permits not yet obtained), prevailing <br /> wage rate tables, etc. Provide proposal form with quantities identified. <br /> 3. Prepare 90% Opinion of Probable Construction Cost (OPCC), updated from <br /> previous submittal. <br /> 4. Provide updated design and construction schedule. <br /> 5. Internal QA/QC and constructability review. <br /> 6. Prepare 90%design submittal for City. <br /> 7. Attend 90%design review meeting with City. <br /> Deliverables: <br /> • 90% Design Drawings (6 hard copies 11"x17", pdf of full-size drawings, CAD <br /> files) <br /> • 90% Design Contract Documents/Specifications (6 hard copies, electronic <br /> Word files) <br /> • 90%OPCC (Excel file) <br /> • Project Schedule (MS Project electronic file) <br /> I. Final Design/Bid Documents <br /> 1. Prepare Final Design Drawings, incorporating City review comments from 90% <br /> Design stage. <br /> 2. Prepare Final Specifications, incorporating City review comments from 90% <br /> Design stage. <br /> 3. Prepare Final Opinion of Probable Construction Cost (OPCC), updated from <br /> previous submittal. <br /> 4. Provide updated design and construction schedule. <br /> 5. Internal QA/QC <br /> 6. Prepare Final design submittal for City. <br /> 181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.