My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/11/03 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/11/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:41:08 AM
Creation date
4/26/2017 9:39:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1 5 City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K October 5, 2010 <br /> UP No. 3443 Page 9 of 9 <br /> IV. Items Not Included in This Scope of Services: <br /> The following services are not included in this Scope of Services. If, during the course of the <br /> project, the need for any of these services is identified, an adjustment to this Scope of Services <br /> will be needed. <br /> • Environmental studies (wetlands, wildlife, and soil analyses except as provided for in <br /> the geotechnical engineering evaluation). <br /> • Laboratory testing of contaminated soils. <br /> • Potholing of any existing underground utilities. <br /> • Additional design meetings or submittals beyond what is specified. <br /> • Permit research and preparation of applications, SEPA checklist preparation, and <br /> other permit and agency-related reviews and approvals, other than providing figures, <br /> calculations, and supporting documentation for the SEPA checklist and WSDOT <br /> franchise/utility permits as described herein. <br /> • Public involvement, other than assistance for and attendance of the neighborhood <br /> meeting <br /> • Easement preparation, negotiation, and acquisition. <br /> • Pre-construction support services including bid review and bid tabulation, reference <br /> check on apparent low bidder, and contract award recommendation to City. <br /> • Construction staking. The Contractor will be responsible for staking the proposed <br /> sewer line based on reference points set by Roth Hill surveyors during the initial <br /> topographic survey. <br /> • Leading administration of the construction contract. <br /> • Construction surveying <br /> • Construction observation/inspection <br /> V. Project Milestones: <br /> Begin Design -January 2011 <br /> Submit Bid Documents January 2012 <br /> Bid Opening February 2012 <br /> Construction Start— March 2012 Complete—September 2012 <br /> See the attached project schedule for a more detailed breakdown of tasks. <br /> 184 <br />
The URL can be used to link to this page
Your browser does not support the video tag.