My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/11/03 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/11/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:41:08 AM
Creation date
4/26/2017 9:39:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Exhibit A— Scope of Work <br /> • Water Main Replacement K October 5,20101 5 <br /> UP No. 3443 Page 8 of 9 <br /> • Hard copies of Draft Construction Record Drawings—6 copies of 11"x 17" <br /> Drawings for review by City. <br /> • Hard copies of Final Construction.Record Drawings, one each of 11" x 17" <br /> and 22" x 34" Drawings, signed and stamped, electronic CAD files. <br /> III. Assumptions: <br /> • City to provide electronic GIS base map of project area including the following <br /> information: connection points, water system, sewer system, storm water system, <br /> buildings, quarter sections, street centerlines, control monuments, paved streets, alleys, <br /> bridges, parcels, lots, right-of-way, and utility easements. <br /> • City to provide electronic templates for plan sheets, including City CAD and survey <br /> standards on CD. <br /> • City to provide 2010 Standard Specification in Microsoft Word format, including: <br /> Divisions 1, 2, 4, 5, 7, 8, and 9, Divisions B, C, F, P, and T, and Appendices A through <br /> D. <br /> • City to provide field book for design survey. <br /> • City to provide record drawings for City water, sewer, and storm drains within the project <br /> area. <br /> • City to provide sample plans and specifications (hard copy) from a recent water project <br /> for reference. <br /> • City to provide electronic CAD files of necessary City standard drawings for the project. <br /> • City will take lead role on obtaining permits, coordination with WSDOT and the SEPA <br /> checklist. <br /> • The City will be responsible for reproducing bid documents from the original copy <br /> provided to the City by Roth Hill <br /> • City to take lead on construction administration and provide construction inspection <br /> services. <br /> • City to maintain field redlines documenting construction progress and variations from the <br /> design drawings, to be provided to Roth Hill for preparation of Construction Record <br /> Drawings. <br /> 183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.