Laserfiche WebLink
(7) Authorize the Mayor to sign the Interlocal Cooperative Agreement between the State <br /> of Washington Administrative Office of the Courts and the Everett Municipal Court to <br /> continue the state-funding interpreting reimbursement program <br /> (8) Authorize the Mayor to sign an Interlocal Agreement with the Washington State <br /> Department of Fish and Wildlife to receive a $100,000 grant for restoration of the <br /> former Drainage District No. 6 <br /> CONSENT ITEMS: <br /> (9) Adopt Resolution No. authorizing claims against the City of Everett in the amount <br /> of $1,242,964.65 for the period of October 16, 2010 through October 22, 2010 <br /> (10) Authorize Request for Proposal 2010-076 for an Electronic Document Management <br /> System <br /> (11) Authorize Bid Call 2010-090 for Annual Supply of Asphalt Products <br /> (12) Accept the Clearwell #2 Project as complete and Authorize the Mayor to sign the <br /> Certificate of Completion with Stellar J. Corporation allowing the retainage bond to be <br /> released <br /> PUBLIC HEARING: <br /> (13) CB 1010-27 -3rd and final Reading — Adopt the Proposed Ordinance levying the general <br /> taxes for the City of Everett for fiscal year commencing January 1, 2011, on all taxable <br /> property, both real and personal, subject to taxation thereon, for the purpose of <br /> raising a portion of the revenue to carry on City operations for the ensuing year, as <br /> required by the Charter of the City of Everett and the laws of the State of Washington <br /> (14) Approve the vacation of that portion of 11th Street lying west of Grand Ave and direct <br /> staff to prepare an ordinance subject to the conditions as contained in the staff report <br /> ACTION ITEMS: <br /> (15) Authorize the Mayor to sign a Professional Services Agreement with RothHill, LLC to <br /> provide engineering design services for Water Main Improvement Project "K" in the <br /> amount of $490,000.00 <br /> (16) Reject Gary Harper Construction, Inc. bid as Non-Responsive and Award the Water <br /> Pollution Control Facility Phase B-1A Improvements Project to the lowest responsive <br /> bidder, McClure and Sons Inc., in the amount of $408,088.04 including Washington <br /> State Sales Tax and Authorize the Mayor to sign the contract with McClure and Sons <br /> Inc. <br />