My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: Water Filtration Facility — 1 6 <br /> Lake Chaplain Recovered Water Outfall Improvements Project <br /> WO# UP-3347 <br /> WORK CHANGE DIRECTIVE - No 01 <br /> DATE OF ISSUANCE July 13, 2010 <br /> You are directed to proceed promptly with the following change (s): <br /> Description: Please provide detailed cost and time implications for Stellar J to meet ARRA <br /> funding requirements including Buy America and Davis-Bacon provisions. <br /> Purpose of Work Change Directive: City of Everett is considering acceptance of ARRA <br /> funding. <br /> Attachments: (List documents supporting change): <br /> If a claim is made that the above change(s)have affected Contract Price or Contract Times,any claim <br /> for a Change Order based thereon will involve one or more of the following methods of determining the <br /> effect of the change(s). <br /> Method of determining change Method of determining change <br /> In Contract Price: in Contract Times: <br /> ❑ Unit Prices D Contractor's records <br /> ® Lump Sum ❑ Engineer's records <br /> ❑ Other ❑ Other <br /> Estimated increase(decrease)in Contract Price: Estimated increase (decrease)in Contract Times: <br /> $2,362.50 Substantial Completion 0 days: <br /> If the change involves an increase,the Ready for final payment 0 days: <br /> estimated amount is not to be exceeded If the change involves an increase,the estimated <br /> without further authorization. times are not to be exceeded without further <br /> lauthorization. <br /> ACCE• E.:: 7tllar- J Corporation AUTHORIZED: Cit •f Everett <br /> By: , "- Date: gl <br /> !!ikiIP By: 1 ,„4" /'"r <br /> Date: '1r <br /> 7-010 <br /> (t1it dr zed Signature) 1 (Authorized Signature) <br /> 171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.