Laserfiche WebLink
16 <br /> STELLAR J CORPORATION <br /> City of Everett,Washington <br /> Construction of Lake Chaplain Recovered Water Outfall Improvements <br /> SJC Project No:599 <br /> Change Order Proposal No: 001 <br /> Description: Change Order Request#001 -Response to owner work change directive#001 -Stellar J will be providing <br /> verfication to owner via informational submittals noting compliance to the ARRA documentation. <br /> Contract Time Extension Request:None <br /> Date: 8/12/10 <br /> Change Order Proposal Summary: <br /> DESCRIPTION Rates COST <br /> Labor Cost Daily Total: — $1,875.00 <br /> Lump Sum Mark-up: 20% $375.00 <br /> S/C Direct Cost Daily Total: — $0.00 <br /> Lump Sum Mark-up: 5% $0.00 <br /> All Other Direct Cost Daily Total: — $0.00 <br /> Lump Sum Mark-up: 15% $0.00 <br /> S/T: — $2,250.00 <br /> Insurance,Builder's Risk,Bond and B&O Taxes: 5% $112.50 <br /> TOTAL LUMP SUM PRICE: — $2,362.50 7.17.1v zr, <br /> WSST 8.3%: 8.30% $196.09 <br /> TOTAL LUMP SUM PRICE(Including Tax): — $2,558.59 <br /> S/T Labor Hours: 25.00 <br /> Notes: <br /> 1. This proposal is based on straight time labor and equipment unless expressly noted. <br /> 2. This proposal is for direct costs only,Contractor reserves the right to claim for impact and consequential costs. <br /> Page 1 <br /> 172 <br />