My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> PROJECT: Water Filtration Facility — <br /> Lake Chaplain Recovered Water Outfall Improvements Project <br /> WO# UP-3347 <br /> WORK CHANGE DIRECTIVE No 03 <br /> DATE OF ISSUANCE August 25, 2010 <br /> You are directed to proceed promptly with the following change (s): <br /> Description: At the Recovered Water Pump Station please provide and install a 12" x 91- <br /> ' 318" ductile iron riser pipe and blind flange per the attached 08/20/10 H. D. Fowler quote that <br /> you forwarded to me. The riser pipe is as measured in the field to extend between the flange <br /> on the buried 24" header pipe and the connection to a 90° bend for the future pump. Per our <br /> discussion backfill for the riser can be a vibrated in place pea gravel. Change in price is to <br /> include exploratory work to locate and measure to the top of the existing header pipe. The <br /> City of Everett will dewater the pipe as far as is possible prior to Stellar J removing the <br /> existing flange and installing the riser. Due to shut down restraints the time for Stellar J to <br /> complete their work shall be limited to six hours. <br /> Purpose of Work Change Directive: Extend future piping above grade prior to constructing <br /> a building that would limit access to doing this work. <br /> Attachments: (List documents supporting change): H. D. Fowler quote. <br /> If a claim is made that the above change(s) have affected Contract Price or Contract Times,any claim <br /> for a Change Order based thereon will involve one or more of the following methods of determining the <br /> effect of the change(s). <br /> Method of determining change Method of determining change <br /> In Contract Price: in Contract Times: <br /> El Unit Prices ❑ Contractor's records <br /> ❑ Lump Sum ❑ Engineer's records <br /> 0 Other ❑ Other <br /> Estimated increase(decrease) in Contract Price: Estimated increase(decrease) in Contract Times: <br /> $9,196.45 Substantial Completion 0 days: <br /> If the change involves an increase,the Ready for final payment 0 days: <br /> estimated amount is not to be exceeded If the change involves an increase,the estimated <br /> without further authorization. times are not to be exceeded without further <br /> authorization. <br /> ACCEPT:.D s =II.rJ Corporation AUTHORIZED:pity,of Everett' �� <br /> By: ,� Date- t 1 tt� By: C/ /N7 i Q-'1 Date: `I/-tio <br /> (Aute• ized Signature) /(Authorized Signature) <br /> 182 <br />
The URL can be used to link to this page
Your browser does not support the video tag.