My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> STELLAR J CORPORATION <br /> City of Everett,Washington <br /> Construction of Lake Chaplain Recovered Water Outfall Improvements <br /> SJC Project No:599 <br /> Change Order Proposal No: 003 <br /> Description: Change Order Request#003-RWSP Extend Riser Pipe for Future Pump Discharge-Performed on a time and <br /> materials basis. <br /> Contract Time Extension Request: None <br /> Date: 8131/10 <br /> Change Order Proposal Summary: <br /> DESCRIPTION Rates COST <br /> Labor Cost Daily Total: — $2,590.50 <br /> Lump Sum Mark-up: 20% $518.10 <br /> S/C Direct Cost Daily Total: — $0.00 <br /> Lump Sum Mark-up: 5% $0.00 <br /> All Other Direct Cost Daily Total: — $4,912.98 <br /> Lump Sum Mark-up: 15% $736.95 <br /> SIT: — $8,758.52 <br /> Insurance, Builder's Risk, Bond and B&O Taxes: 5% $437.93 <br /> TOTAL LUMP SUM PRICE: — $9,196.45 OfffiESE <br /> WSST 8.3%: 8.30% $763.31 <br /> TOTAL LUMP SUM PRICE(Including Tax): — $9,959.76 <br /> SIT Labor Hours: 35.50 <br /> Notes: <br /> 1. This proposal is based on straight time labor and equipment unless expressly noted. <br /> 2. This proposal is for direct costs only,Contractor reserves the right to claim for impact and consequential costs. <br /> Page 1 <br /> 183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.