Laserfiche WebLink
1$1H.D. FOWLER <br /> COMPANY 16 <br /> Customer: STELLAR J CORPORATION Bid No: B156775 <br /> Estimator: SHAWN OVERTON Bid Date: 8/30/2010 <br /> Job Name: LAKE CHAPLAIN <br /> Location: SEATTLE <br /> Line Qty UoM Description Unit Price Extended Price <br /> 1 1 EA 12"X 91-3/8"DI SPOOL FL X FL PRIMER COATED 1,195.37 1,195.37 <br /> 2 2 EA 12"1/8"FULL FACE RED RUBBER GASKET,150# 6.88 13.76 <br /> 3 1 EA 12"BLIND FLANGE,DI,AWWA C110,NORMALLY BARE FINISH(87 LBS) 203.71 203.71 <br /> DOMESTIC <br /> 4 2 EA 12"304SS BOLT KIT 148.96 297.92 <br /> Approximate Total 1,710.76 <br /> 191 <br />