My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/01 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:53:51 AM
Creation date
4/26/2017 10:52:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K November 12, 2010 <br /> UP No. 3443 Page 9 of 9 <br /> • Construction staking. The Contractor will be responsible for staking the proposed <br /> sewer line based on reference points set by Roth Hill surveyors during the initial <br /> topographic survey. <br /> • Leading administration of the construction contract. <br /> • Construction surveying <br /> • Construction observation/inspection <br /> V. Project Milestones: <br /> Begin Design January 2011 <br /> Submit Bid Documents January 2012 <br /> Bid Opening February 2012 <br /> Construction Start— March 2012 Complete —September 2012 <br /> See the attached project schedule for a more detailed breakdown of tasks. <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.