Laserfiche WebLink
3 <br /> City of Everett Exhibit A—Scope of Work <br /> Water Main Replacement K November 12, 2010 <br /> UP No. 3443 Page 9 of 9 <br /> • Construction staking. The Contractor will be responsible for staking the proposed <br /> sewer line based on reference points set by Roth Hill surveyors during the initial <br /> topographic survey. <br /> • Leading administration of the construction contract. <br /> • Construction surveying <br /> • Construction observation/inspection <br /> V. Project Milestones: <br /> Begin Design January 2011 <br /> Submit Bid Documents January 2012 <br /> Bid Opening February 2012 <br /> Construction Start— March 2012 Complete —September 2012 <br /> See the attached project schedule for a more detailed breakdown of tasks. <br /> 36 <br />