My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:19:04 AM
Creation date
4/26/2017 11:17:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 1. General <br /> 2. Structure Removal <br /> 3. Structural alternatives <br /> 4. Paving and Channelization <br /> 5. Grading and Drainage <br /> 6. Traffic control plan <br /> 7. Staging <br /> 8. Preliminary cost estimates for each alternative <br /> 9. Constructability review <br /> Deliverables: <br /> • Two copies of the Alternative Study Report <br /> B. PS&E Preparation <br /> The PS&E Contract Documents will be by supplement to this agreement. It is anticipated that <br /> the design team will negotiate another contract to prepare Final PS&E(i.e. construction <br /> documents) for the Project based on the Alternative Study Phase activities using current City of <br /> Everett design standards and other relevant guidelines. <br /> TASK 11: MANAGEMENT RESERVE <br /> This Task encompasses optional or unanticipated minor design tasks that the City may desire to <br /> complete as part of the Project. Before proceeding,the Consultant will prepare a scope and fee <br /> for the work for the City's review and the work will not begin until both parties agree upon the <br /> scope & fee, and the work is authorized by the City's Project Manager. A maximum of$41,000 <br /> has been budgeted for this task. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.