My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:19:04 AM
Creation date
4/26/2017 11:17:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Broadway Bridge Replacement Project <br /> Sub Consultant: Perteet,Inc. <br /> Direct Salary Cost (DSC): <br /> Classification Man Hours Rita--- _ -Cost — <br /> Principal 108.0 X 75.36 $ 8,138.88 <br /> Associate(PM) 168.0 X 53.74 9,028.32 <br /> Project Manager 92.0 X 42.17 3,879.64 <br /> Engineer I 188.0 X 25.00 4,700.00 <br /> CAD Tech III 84.0 X 24.00 2,016.00 <br /> CAD Tech IV 44.0 X 34.00 1,496.00 <br /> Associate(Env.Manager) 18.0 X 52.88 951.84 <br /> Senior Planner 41.0 X 42.00 1,722.00 <br /> Ecologist III 36.0 X 32.00 1,152.00 <br /> Total DSC = $ 33,084.68 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of 166.90 % x $ 33,084.68 = 55,218.33 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30 % x $ 33,084.68 = 9,925.40 <br /> Reimbursables: <br /> Itemized = 15,770.00 <br /> SubConsultant Total = <br /> Grand Total = 113,998.41 <br /> Prepared By: Perteet, Inc. Date: November 19, 2010 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01/09 4 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.