My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:19:04 AM
Creation date
4/26/2017 11:17:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Broadway Bridge Replacement Project <br /> Sub Consultant: Perteet,Inc. <br /> Direct Salary Cost (DSC): <br /> -Classification Man Hours Rata = Cost <br /> Planner H 162.0 X 32.00 $ 5,184.00 <br /> Planner II/GIS 16.0 X 31.20 499.20 <br /> Clerical 24.0 X 26.00 624.00 <br /> Principal Surveyor 4.0 X 61.66 246.64 <br /> Survey Manager 28.0 X 45.67 1,278.76 <br /> PLS 70.0 X 36.58 2,560.60 <br /> Survey Tech 292.0 X 26.00 7,592.00 <br /> Project Surveyor 99.0 X 29.00 2,871.00 <br /> X <br /> Total DSC = $ 20,856.20 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of 166.90 % x $ 20,856.20 = 34,809.00 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30 % x $ 20,856.20 = 6,256.86 <br /> Reimbursables: <br /> Itemized = <br /> SubConsultant Total = <br /> Grand Total = 61,922.06 <br /> Prepared By: Perteet,Inc. Date: November 19, 2010 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01/09 <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.