Laserfiche WebLink
addition to the requirements of Section 10 (37.100) of this chapter. A detailed mitigation <br />plan shall be approved by the city prior to any development activity occurring on a lot <br />upon which wetland or wetland buffer alteration, restoration, creation or enhancement is <br />proposed. The mitigation plan shall be prepared by a qualified professional who is a <br />certified Professional Wetland Scientist, a noncertified professional wetland scientist with <br />a minimum of five (5) years of experience in the field of wetland science, or a professional <br />who demonstrates expertise in wetland science to the satisfaction of the planning director. <br />The qualifications of the professional who prepared the plan shall be included in the <br />mitigation plan. The director shall have the authority to hire an outside consultant at the <br />applicant's expense to review plans when the City has concerns about the accuracy or <br />completeness of the plan. The plan shall use accepted methodologies and include <br />information as required by the planning director's administrative guidelines, and shall: <br />1. Include a baseline study that quantifies the existing wetland and buffer functions, <br />functions that will be lost, and the functions after mitigation; <br />2. Specify how functions will be preserved or replaced; <br />3. Specify how impacts will be avoided, minimized or compensated for; <br />4. Assess the potential changes in wetland hydroperiod from the proposed project and <br />identify how the project design will mitigate adverse impacts to the wetland <br />hydroperiod; <br />5. Describe the future vegetation community types for monitoring years, including <br />dominant vegetation expected. Plants shall be native species, commercially available or <br />available from local sources, high in food and cover value for fish and wildlife, and <br />mostly perennial; <br />6. Specify when mitigation will occur relative to project construction and to the <br />requirements of permits issued by other agencies; <br />7. Include measurable criteria for evaluating whether the performance goals of the <br />mitigation proposal have been met, and include provisions for maintenance and <br />monitoring the mitigated area on a long-term basis to determine whether the plan was <br />successful; <br />8. Include a contingency plan specifying what corrective actions will be taken to achieve <br />performance goals should the mitigation not be successful; and <br />9. Include provisions for an assurance device as provided by Chapter 40 of this title to <br />ensure that work is completed in accordance with the mitigation plan, that maintenance <br />and monitoring occurs on a regular basis, and that restoration or rehabilitation is <br />performed in accordance with the contingency plan if mitigation failure results within <br />five years of implementation. The construction performance guarantees shall not be <br />released until the applicant's qualified professional and the planning director sign off to <br />33 <br />