Laserfiche WebLink
CITY OF EVERETT WPCF B-1 IMPROVEMENTS <br /> WCD Contractor DESCRIPTION PRICE TIME ISSUE CONT. CITY Accept CO# N <br /> # Proposal $ DAYS DATE DATE DATE $ <br /> # <br /> 001 WCD-001 Revise P-SCC-1051A and P-SCC-1051B (18,607.00) _ 0 05/11/10 09/30/10 09/30/10 (18,607.00) <br /> 002 Revise conduit West of AC-1 (4,642.60) 0 07/07/10 09/30/10 09/30/10 (4,642.60) <br /> 003 AC-2 Pile location (4,368.18) 0 05/12/10 08/16/10 08/23/10 (4,368.18) <br /> 004 Add aggregate subgrade for monorail foundations 2,268.00 0 06/14/10 06/16/10 08/23/10 2,268.00 <br /> 005.REV Revised Odor Control Building Pumped Drain Piping (2,168.00) 7 07/01/10 12/07/10 12/08/10 (2,168.00) <br /> 006 Revise aerator cable routing 1,670.00 0 09/09/10 09/27/10 09/30/10 1,670.00 <br /> 007 Revised AC-1 Slope protection at Monorail supports 5,341.00 0 06/30/10 08/19/10 08/23/10 5,341.00 <br /> 008 Use PVC instead of PVC coated galvanized steel conduit (1,220.00) 0 07/13/10 09/06/10 09/23/10 (1,220.00) <br /> between the aerator bus gutters and starters. <br /> 009 Shorten FEN Riser pipe at FEN Pump Station 1,032.00 0 07/16/10 08/25/10 08/26/10 1,032.00 <br /> 010 Extend Milestone 1 Substatial Completion Date 0.00 94 12/02/10 12/02/10 12/02/10 0.00 <br /> 011 Removal of additional aerator electrical junction boxes 840.00 0 07/21/10 08/16/10 08/23/10 840.00 <br /> and cable <br /> 0&2 Reimburse Cochran Electric for Electrical Permit 2,554.00 0 07/23/10 08/16/10 08/23/10 2,554.00 <br /> CfrA Revise lineal feet of pile walls in AC-2 1,790.00 8 07/28/10 10/11/10 10/26/10 1,790.00 <br /> 014 Compost Filter Drains 8,457.00 21 09/15/10 10/11/10 10/26/10 8,457.00 <br /> 015 Revise layout of pile walls in AC-2 5,661.00 1 10/04/10 10/25/10 10/26/10 5,661.00 <br /> (1,392.78) 37.00 (1392.78) <br /> • <br /> Page 1 of 1 <br />