2 <br /> Work Change Directive WCD-14" Pipe was changed to improve flexibility of installation. Vault was <br /> not shown at the proper depth on the Contract Drawing. Cleanouts were added for better <br /> maintenance of the installed system. The jib crane was changed to provide a safer installation and <br /> provide a longer reach. <br /> Work Change Directive WCD-15 "Avoid conflict with submerged obstructions and to facilitate future <br /> slip lining of 54" pipe. <br /> 9 <br />