Laserfiche WebLink
Exhibit A—Description of Changed Work <br /> Change Order#1 <br /> Create New "Bid Item #7—entitled, "Change Order No. 1", in the lump sum amount of($1,392.78), <br /> which shall incorporate Work Change Directives 01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12, 13, 14 <br /> and 15 per the following: <br /> Work Change Directive WCD-01"' 1) Drawing E-371, E-374, E-377 and E-382- Do not purchase or <br /> install conduit or conductors shown as P-SCC-1051A and P-SCC-1051B. 2) Reuse P-SCC-D conductors <br /> between SWBD 1051 and SCC-D provide and install needed conduit. Provide the bus gutter in NEMA <br /> 4X enclosure, shown on Drawing E-477,to the City of Everett for their future use. Aerators AER-01, <br /> AER-02 and AER-04 are to be connected to SCC-D. 3) Reuse P-SCC-E conductors between SWBD 1051 <br /> and SCC-E provide and install needed conduit. Provide bus gutter in NEMA 4X enclosure, shown on <br /> Drawing E-478,to the City of Everett for their future use. Aerators AER-07,AER-08 and AER-11 are to <br /> be connected to SCC-E. <br /> Decrease the Contract Amount by$18,607.00. <br /> Work Change Directive WCD-02"' 1) Use existing conduit and ground wire rather than install new for <br /> P-SCC-1500A between SWBD1500 and MH-1502. Delete CONSTRUCTION NOTE 11 existing concrete <br /> will not need to be removed. NOTE new conduit and ground wire is still required between MH-1502 <br /> and SCC-1500A. 2) Use existing ground wire rather than install new for P-SCC-1501-A between SWBD <br /> 1501 and MH-1504. New ground wire is still required between MH-1504 and SCC-1501A. 3) Drawing <br /> E-382 If the conductors meet the load calculations and are provided THHN/THWN the contractor may <br /> at their option use a parallel run of 3/0 in lieu of the shown 600KCM mil conductor shown on Drawing <br /> E-382 for P-SCC-1500A and P-SCC-1501A. <br /> Decrease the Contract Amount by$4,642.60. <br /> Work Change Directive WCD-03"' Revise the location of the sheet pile to be installed in AC-2. <br /> Decrease the Contract Amount by$4,368.18. <br /> Work Change Directive WCD-04"' Install a 1-foot deep aggregate subgrade under the three monorail <br /> foundations not over the existing jib crane. Aggregate to be 1-1/2" or 1-1/4" minus with no more <br /> than 5%fines. Change the elevation for the top of the foundation shown in Drawing S-373 Detail 3 to <br /> 13.5. This revision will raise the entire monorail one foot but not cause additional excavation to <br /> install the aggregate subgrade. <br /> Increase the Contract Amount by$2,268.00. <br /> Work Change Directive WCD-05 "' Revise the Fan Building piping layout. 1) Core drill the sump wall to <br /> accommodate the 3-inch discharge of each pump and installation of link seals. 2) Piping downstream <br /> of the stainless steel flanged coupling adapter shall be schedule 80 PVC. 3) Exit the building through <br /> the east wall instead of the north wall. 4) Core drill east wall to accommodate pipe and installation of <br /> link seal. 5) Provide valves and piping per the attached or equal. 6) Revise specified sump coatings to <br /> Mortarclad 218 and PermaGlaze 435. <br /> Decrease the Contract Amount by 2,168.00 and add 7 calendar days to Milestone 2 and the Final <br /> Completion. <br /> 6 <br />