My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/12/29 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/12/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 8:48:38 AM
Creation date
4/28/2017 8:47:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Work Change Directive WCD-06'" Revise the power cable routing: 1) For AER-02 to go from AER-02 <br /> to a junction box on piling 2 and then to HH-SCC-1051A. 2) For AER-04 to go from AER-04 to a <br /> junction box on piling 9 and then to HH-SCC-1051A. <br /> Increase the Contract Amount by$1,670.00. <br /> Work Change Directive WCD-07'" Modify AC-1 and AC-2 slope protection replacement at monorail <br /> supports. Place concrete to match the high point of the existing slope protection and then slope the <br /> top of the new concrete toward the pond at a 1-2%slope. Reinforce with#4 rebar on 12" centers <br /> and include diagonal bars at the corner of the monorail support column. <br /> Increase the Contract Amount by$5,341.00. <br /> Work Change Directive WCD-08"' Use PVC instead of PVC coated rigid conduit between aerator bus <br /> gutters &starters. <br /> Decrease the Contract Amount by$1,220.00 <br /> Work Change Directive WCD-09"'Cut 12-inch FEN riser pipe to raise invert elevation of FEN pipe <br /> shown on Drawing C-191 at station 1+00 from 8.00 to 9.4. Provide Mi x FL adapter to connect riser <br /> pipe to flanged HDPE pipe at the bottom of the riser. Maintain downward slope on pipe from the <br /> FEN Pump Station to the south end at the Oxidation Pond. <br /> Increase the Contract Amount by$1,032.00 <br /> Work Change Directive WCD-10— Extend Milestone 1 Substantial Completion date for installation of <br /> aeration system in AC-1 by 94 calendar days. <br /> Extend Milestone 1 by 94 calendar days. This does not affect the Final Completion date of the <br /> Con tract. <br /> Work Change Directive WCD-11 — Remove the additional electrical junction boxes and cables on and <br /> in AC-1 not associated with brush aerators to be removed by Contract. <br /> Increase the Contract Amount by$840.00 <br /> Work Change Directive WCD-12"' Reimburse Cochran Electric for the Electrical Permit that by <br /> Contract is to be paid by the Owner. <br /> Increase the Contract Amount by$2,554.00. <br /> Work Change Directive WCD-13 "' Revise the lengths and placement of pile in AC-2 per the attached <br /> drawings. Work will require cutting some pile and installing more sections of pile but the lineal feet <br /> of pile to be driven will not change. <br /> Increase the Contract Amount by$1,790.00 and add 8 calendar days to Milestone 2 and the Final <br /> Completion. <br /> Work Change Directive WCD-14^' Revise the piping and increase the depth of the vault between the <br /> Compost Filters and the Fan Building. <br /> Increase the Contract Amount by$8,457.00 and add 21 calendar days to Milestone 2 and the Final <br /> Completion. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.