Laserfiche WebLink
EXHIBIT B Lp <br /> Fee Estimate Worksheet <br /> PERSONNEL& HOURLY RATES TOTAL TASK <br /> WORK TASK Principal Proj mgr 1 Sr geol Staff geol CAD 1 Admin. TOTAL SUB LABOR TOTAL DIRECT TOTAL <br /> DESCRIPTION $220.00 $138.00 1 $115.00 $75.00 $74.00 I $69.00 HOURS TOTAL ESC* LABOR COSTS <br /> Task 1A-Ground water monitoring and reporting <br /> Prep(supplies,labs,etc.) 40 40 <br /> Ground water sampling 0 20 320 340 <br /> Proj Mgmt 5 20 10 35 <br /> Annual Report 10 10 50 50 10 130 <br /> Sub total 15 50 50 410 20 545 $48,080 $ 9,616 57,696 539,512 $ 97,208 <br /> Task 1B-Gas monitoring and reporting <br /> Prep(supplies,etc.) 40 40 <br /> Gas probe sampling 400 400 <br /> Gas(building)sampling 120 120 <br /> Gas alarm calibration/repair 80 80 <br /> Reporting 0 20 40 60 <br /> 1/4.0 Proj Mgmt 0 40 40 80 <br /> Annual report 2.5 10 80 20 10 5 127.5 <br /> Subtotal 70 80 700 10 45 907.5 $75,755 $ 15,151 90,906 517,700 $ 108,606 <br /> Task 2-Consulting support and regulatory compliance <br /> Consulting support 20 20 40 <br /> Reporting 20 20 <br /> Meetings 14 14 <br /> Proj Mgmt 8 4 12 <br /> Sub total 20 0 0 4 86 $16,676 $ 3,335 20,011 575 $ 20,086 <br /> LABOR: 94.5 280 260 2220 20 138 3077 $ 140,511 $ 28,102 $168,613 $57,287 $225,900 <br /> *Labor rate escalator,5%per year <br />