Laserfiche WebLink
WORK PLAN ELEMENT RECRUITMENT RETENTION REVITALIZATION <br /> ► Maintain City infrastructure to the standard that attracts <br /> businesses of all sectors. X X X <br /> • Maintain Utilities Capital Improvement Program to <br /> ensure that capacity can accommodate growth. <br /> Examples: <br /> • Water Pollution Control Facility Expansion <br /> • Sewer L Replacement and capacity <br /> improvements <br /> • Water transmission line#3 replacement <br /> (Phase 7) <br /> • Maintain street overlay program. <br /> • Maintain Transportation Improvement Plan and <br /> pursue grant funding opportunities. <br /> • Complete construction of downtown streetscape <br /> improvements (Hoyt and California) Phase 1. <br /> Complete design of downtown streetscape <br /> improvements (Rucker) Phase 2. <br /> • Complete design of Broadway Bridge Replacement. <br /> Construction scheduled for 2012. <br /> • Complete signal improvement projects (city wide). <br /> • Complete four additional swift bus Rapid Transit <br /> Stations and bus rapid transit corridor signalization <br /> projects. <br /> • Complete Evergreen Way Revitalization Plan. <br /> • Complete pedestrian safety improvements: <br /> downtown, 112th St., Everett Mall Way, Rucker Ave., <br /> Casino Rd. and Horizon Elementary School. <br /> ► Maintain streamlined, efficient, and business friendly <br /> permit processes. X X X <br /> • Establish on-line permitting for building permits. <br /> ► Work with federal and state agencies to maintain <br /> property owners' ability to develop along shorelines <br /> adjacent to floodplain areas and protect the area's X X X <br /> potential for industry and job growth. <br /> Page 6 of 11 <br />