My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/01/26 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/01/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 10:06:52 AM
Creation date
4/28/2017 10:06:11 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/26/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Granite Construction ADDRESS: 1525 East Marine View Drive <br /> CITY: Everett STATE: WA 98201 DATE: January 3, 2011 <br /> PROJECT TITLE: ARRA Hot Mix Asphalt Overlay 2010 WORK ORDER NO. PW3400 <br /> DATE WORK COMPLETE: December 30, 2010 FINAL AMOUNT: $ 589,414.62 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I may have, arising out of the performance of said contract, wh' • -- - .ot set forth in said estimate. <br /> �pNZE/�q <br /> �� X P(C? 1.41RE <br /> C 67szJty" ;. 0 , 5 TITLE %r S Y-' 0 <br /> Granite Construction �� o ��J��,� i <br /> ti <br /> Subscribed and sworn to before 0 o Q.� Q�� <br /> me this _d .xy <br /> ay of Jn . .O/( <br /> X € �l Notary Public STATE OF,,,, <br /> in and for the State ofVashington, residing at <!c��ii ! <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X ,n/-,,,,,1, 41A- X <br /> Construction Manager Public Wor s Director <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.