Laserfiche WebLink
. EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 3 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with GHD for the Consent Contact Person Heather Griffin <br /> Shore Avenue Stormwater Action Phone Number (425) 257-7206 <br /> Outfall Improvement Project First Reading FOR AGENDA OF Jan 26, 2011 <br /> Second Reading <br /> Third Reading Initialed by: <br /> Public Hearing Department Head. <br /> Budget Advisory CAA sL <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Shore Avenue 12/20/2006 Professional Amendment No. 3 Public Works <br /> Services Agreement <br /> Amount Budgeted $650,000 <br /> Expenditure Required $0 Account Number(s): UP 3118 <br /> Budget Remaining $539,046 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> In January 2007,the City entered into a Professional Services Agreement with GHD to evaluate and design a <br /> permanent facility that utilizes existing underground sewer pipeline for conveying surface water down the <br /> hillside of the 3200 block of Shore Avenue. Currently, City surface water along that block of Shore Avenue <br /> collects into a temporary above-ground pipe. This pipe drops over 100 feet down the steep slope to a ditch at <br /> the BNSF railroad tracks. Flows in the BNSF ditch cross under the tracks in a culvert and discharge to <br /> Possession Sound. This temporary above-ground pipe was installed 12 years ago to address erosion <br /> problems on the hillside above the BNSF railroad tracks. <br /> In January 2010,the City applied for a crossing permit which has not been issued yet. Amendment No. 3 to <br /> the Professional Services Ageement with GHD extends the date of completion from January 31, 2011,to <br /> March 1, 2013. <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign Amendment No. 3 to the Professional Services Agreement with GHD to extend <br /> the date of completion for the Shore Avenue Outfall Improvement Project at no additional cost. <br /> 83 <br />