Laserfiche WebLink
3. City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 4. A permit is required for the destination of the fill if within the Everett City limits. <br /> 5. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered <br /> with mulch as directed by the City Engineer. <br /> 6. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 7. Haul routes within the Everett City limits must be approved by the City Traffic Engineer. <br /> 7 7/ <br />