My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BASE FILE 2017-05-01
>
Address Records
>
W CASINO RD
>
3003
>
BASE FILE
>
3003 W CASINO RD BASE FILE 2017-05-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 8:18:42 AM
Creation date
5/1/2017 8:18:38 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. During construction, all petroleum products, chemicals, and building materials that could <br /> contaminate runoff must be stored in a lined covered area. An impervious berm must be <br /> constructed around the perimeter of the storage area. The storage area must be located <br /> away from environmentally sensitive areas. (SEPA Earth, Water and Environmental Health <br /> Policies) <br /> Section 8: PUBLIC SERVICES AND UTILITIES <br /> 8.1 FIRE <br /> 8.1.3 Mitigation Measures: None. <br /> 8.2 POLICE <br /> 8.2.3 Mitigation Measures: None. <br /> 8.3 SCHOOLS <br /> 8.3.3 Mitigation Measures: None. <br /> 8.4 PARKS AND RECREATION <br /> 8.4.3 Mitigation Measures: None. <br /> 8.5 COMMUNICATIONS <br /> 8.5.3 Mitigation Measures: None. <br /> 8.6 PUBLIC WATER SUPPLIES <br /> 8.6.3 Mitigation Measures: None <br /> 8.7 SEWER <br /> 8.7.3 Mitigation Measures: None <br /> OTHER REQUIREMENTS <br /> Public Works - Kirk Brooks (425) 257-8814 <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing temporary construction erosion control. Public Works Department approval of <br /> theses drawings is required prior to any permits being issued. <br /> 2. Construction Stormwater Pollution Prevention will be required for this project in compliance <br /> with City standards. In addition, because the project will disturb more than an acre of land, <br /> the applicant must apply for coverage under the Washington State Department of Ecology's <br /> Construction Stormwater General Permit. <br /> 6 017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.