My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 9:56:16 AM
Creation date
5/1/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 6 EXHIBIT A <br /> SCOPE OF SERVICES <br /> Background <br /> This Scope of Services is for the City of Everett 2012 Comprehensive Sewer Plan (CSP) <br /> Update of the 2006 Sewer Plan and to coordinate and to update the 2008 Combined Sewer <br /> Overflow (CSO) Reduction Plan. The goals of this CSP are to define level-of-service goals, build <br /> consensus among stakeholders, and provide a cost efficient and prioritized Capital <br /> Improvement Plan. This project will begin in early 2011 and is expected to last approximately 18 <br /> months. <br /> The consultant team is lead by HDR Engineering as the prime consultant and includes HWA <br /> Geosciences (HWA) for local geohydrology and Mel Schaefer (MGS) for design storm event <br /> statistical analysis. <br /> Task 100 - Project Management. <br /> Objective <br /> To monitor, control and adjust the CSP scope, schedule, and budget as well as provide monthly <br /> status reporting, accounting, and invoicing. <br /> HDR Services <br /> 1. Prepare a Project Management Plan (Project Guide) outlining the project scope, team <br /> organization, schedule, and communications information. <br /> 2. Coordinate and manage the project team. <br /> 3. Subcontract with and manage project subconsultants. <br /> 4. Prepare monthly status reports describing with the following: <br /> A. Services completed during the month <br /> B. Services planned for the next month <br /> C. Needs for additional information <br /> D. Scope/schedule/budget issues <br /> E. Schedule update and financial status summary <br /> 5. Prepare monthly invoices formatted in accordance with contract_terms. <br /> 6. Project Manager will attend monthly project management meetings with the client Project <br /> Manager to review project scope, schedule, and budget issues. <br /> 7. Quality assurance —Complete periodic quality assurance management reviews to monitor <br /> project execution. <br /> 8. Set up and maintain a project SharePoint site for the project team access to post and share <br /> project information. <br /> City of Everett Comprehensive Sewer Plan Update 6 3 Scope of Services April 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.