My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 9:56:16 AM
Creation date
5/1/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables 6 <br /> 1. Draft and final text for optional updates to stormwater policies, ordinances, and standards <br /> for new development and redevelopment in combined sewer areas—emailed PDF. <br /> 2. Draft and final technical memorandum on modeling methodologies for evaluating the <br /> effectiveness of GSI alternatives —emailed PDF. <br /> 3. Materials for one 2-hour-long stormwater workshop. <br /> 4. Electronic modeling files and spreadsheets used for sizing stormwater separation and GSI <br /> facilities—CD-ROM to be provided at the conclusion of the project. <br /> 5. Draft and final documentation on the assumptions, methods, and results for this task, to be <br /> incorporated into the draft and final Sewer Plans under Task 1700. <br /> • <br /> Task 900 — Develop and Evaluate System and Basin <br /> Alternatives <br /> Objective <br /> To develop and evaluate sewer system alternatives for improving levels of service within <br /> prioritized basins in the combined area. <br /> HDR Services <br /> 1. Based upon the results from the previous tasks to evaluate the existing levels of service, <br /> develop basin-by-basin and system alternatives to improve levels of service in selected high <br /> priority basins within the combined area. <br /> 2. Hold up to two basin alternative development and evaluation workshops at the City offices <br /> with City staff. The purpose of each workshop will be to develop, review, discuss, prioritize, <br /> and eliminate or select alternatives methods for increasing the LOS in selected basins... <br /> 3. Develop basin level of service alternatives that consider a variety of system options <br /> including: <br /> A. Capital improvement that include pipe and pump station capacity upgrades, storage, <br /> infiltration and inflow control (in separated areas), and stormwater separation and/or <br /> Green Stormwater Infrastructure (GSI) (in combined areas). <br /> B. Operations and/or maintenance activities that could improve levels of service. <br /> C. Ordinances with infrastructure improvement requirements for development and <br /> redevelopment that will help reduce stormwater flows into combined sewer areas. <br /> 4. Develop system wide alternatives to improve level of service within basins and the collection <br /> system considering the entire sanitary and combined wastewater collection and treatment <br /> systems. The alternatives development will begin with an understanding of the current <br /> loading and available capacity of key existing wastewater facilities including trunk sewers, <br /> • interceptors, lift stations, secondary treatment facilities and treated effluent outfalls. The <br /> alternatives will include alternative conveyance routing and satellite treatment. Treatment <br /> options will include combined sewer treatment, secondary treatment, or a combination of <br /> both. <br /> City of Everett Comprehensive Sewer Plan Update a a Scope of Services April 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.