My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 9:56:16 AM
Creation date
5/1/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 3. Twenty compact disks with PDF file copies of the water plan and appendices. <br /> 4.. Two CDs with all of the CSP deliverable base files used in the project (Word, Excel, GIS, <br /> InfoSWMM). <br /> Task 1800 - Subconsultant MGS Design Storm Consulting <br /> Objective <br /> To provide consulting services for assistance in determining the appropriate design storm(s) to <br /> be used for the sewer system analysis. <br /> MGS Services <br /> 1. Build upon recent work for the City to review historical rainfall data from rain gauges in the <br /> vicinity of Everett. Discuss the rationale used to select gauges and rainfall data. <br /> 2. Update recommendations for a long term (20 years or greater) rainfall time series with short <br /> time increments (5 minutes) for use in analyzing the combined sewer collection system <br /> within the City of Everett. <br /> 3. Identify any measureable and/or significant differences in rainfall patterns within the City and <br /> provide recommendations on the impact to the rainfall time series that will be used in the <br /> system modeling analysis. <br /> 4. Assist the project team in selecting design rainfall events in subsequent sewer collection <br /> system analysis. <br /> Assumptions <br /> 1. Up to three meetings will be held with the City. The first will be to identify, collect and review <br /> rainfall data. The second meeting will be to review the rainfall analysis and document the <br /> recommended rainfall time series. A third meeting may be held to review subsequent <br /> design event selection. <br /> Deliverables <br /> 1. Draft and final technical memoranda documenting rainfall within the City of Everett and <br /> recommendations for representative long term rainfall series for analysis in the sewer model <br /> —emailed Word and PDF files. <br /> Task 1900 — Subconsultant HWA LID/GSI Consulting <br /> Objective <br /> To provide consulting services to determine the applicability of Low Impact Development (LID) <br /> and/or Green Stormwater Infrastructure (GSI) improvements with shallow or deep infiltration that <br /> could be considered as options to reduce the volumes of stormwater entering the City's <br /> combined sewer system. <br /> HWA Services <br /> 1. Perform a review of available geologic and hydrogeologic data, including soil maps, geologic <br /> maps, boring logs, well logs, and HWA in-house data, for the Everett area. <br /> City of Everett Comprehensive Sewer Plan Update Scope of Services April 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.