Laserfiche WebLink
• <br /> • <br /> BID TABULATION <br /> Replacement of Water Transmission Line No.3,Phase 7 <br /> W.O.#UP 3437-4 <br /> Date 5/11/2011 <br /> Prepared By:William Barrett <br /> For:Souheil Nasr,Project Engineer ENGINEER`S ESTIMATE IMCO General Construction Northwest'Construction James W.Fowler Company McClure and Sons,Inc. <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> # ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 19 Remove&Dispose/Salvage LS I $122,696.00 $122,696.00 $78,602.00 $78,602.00 $95,000.00 $95,000.00 $45,000.00 $45,000.00 $85,000.00 $85,000.00 <br /> Existing Pipeline No.3 <br /> 20 Remove&Dispose/Salvage LS 1 $163,672.00 $163,672.00 $73,000.00 $73,000.00 $220,000.00 $220,000.00 $220,000.00 $220,000.00 $120,000.00 $120,000.00 <br /> Existing Creosote Pile Support <br /> 21 Hydroseed-Seed Mix 1 Acre 1.0 $2,344.00 $2,344.00 $2,300.00 $2,300.00 $2,500.00 $2,500.00 $1,700.00 $1,700.00 $2,500.00 $2,500.00 <br /> I <br /> 22 Hydroseed-Seed Mix 2 Acre 5.0 $2,344.00 $11,720.00 $1,030.00 $5,150.00 $1,100.00 $5,500.00 $1,200.00 $6,000.00" $1,500.00 $7,500.00 <br /> 23 Traffic Control Plan& LS 1 $44,362.00 $44,362.00 $120,000.00 $120,000.00 $28,000.00 $28,000.00 $8,500.00 $8,500.00 $10,000.00 $10,000.00 <br /> Maintenance <br /> 24 Traffic Control Labor Hour 800 $55.00 $44,000.00 $50.00 $40,000.00 $61.00 $48,800.00 $50.00 $40,000.00 $56.00 $44,800.00 <br /> 25 Record Drawings LS I $5,520.00 $5,520.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 <br /> 26 Vibration&Settlement Monitoring LS 1 $136,581.00 $136,581.00 $50,000.00 $50,000.00 $25,000.00 $25,000.00 $70,000.00 $70,000.00 $25,000.00 $25,000.00 <br /> 27 Additional Steel Pipe Pile Splice EA 85 $555.00 $47,175.00 SI00.00 $8,500.00 $350.00 $29,750.00 $1,600.00 $136,000.00 $300.00 $25,500.00 <br /> 281.__Pumish Additional Steel Pipe Pile LF 1,550 $76.00 $117,800.00 $40.00 $62,000.00 $85.00 $131,750.00 $80.00 $124,000.00 $90.00 $139,500.00 <br /> ssiength <br /> • <br /> 1-4 <br /> Base Bid $7,823,661.00 $5,686,000.00 $5,695,001.00 $5,771,235.00 $5,840,277.00 <br /> Sales Tax8.6% $672,834.85 $488,996.00 $489,838.89 $496,326.21 $502,263.82 <br /> Contract Totals: $8,496,495.85 $6,174,996.00 $6,185,639.89 $6,267,561.21 $6,342,540.82 <br /> tU <br /> F.....b <br />