Laserfiche WebLink
BID TABULATION <br /> Replacement of Water Transmission Line No.3,Phase 7 <br /> W.O.#UP 3437-4 <br /> Date 5/11/2011 <br /> i-V <br /> r <br /> Prepared By:William Barrett <br /> For:Souheil Nasr,Project Engineer ENGINEER'S ESTIMATE Quest Civil Constructors American Construction Don Kelly Construction Tri-State Construction <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> 6 ITEM DESCRIPTION UNIT QUANTITY PRICE_ AMOUNT PRICE AMOUNT `PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 1 Mobilization LS 1 5728,546.00 $728,546.00 $630,000.00 $630,000.00 $460,000.00 S460,000.00 $480,000.00 $480,000.00 $350,000.00 $350,000.00 <br /> 2 Project Surveying LS I $111,545.00 $111,545.00 $25,000.00 $25,000.00 $5,000.00 $5,000.00 $18,500.00 $18,500.00 $75,000.00 $75,000.00 <br /> 3 Construction Work Plan LS 1 $21,466.00 $21,466.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $11,500.00 $11,500.00 $25,000.00 $25,000.00 1 <br /> 4 Force Account FA 50,000 $1.00 $50,000.00 $1.00 $50,000.00 $1.00 $50,000.00 $1.00 $50,000.00 $1.00 $50,000.00 <br /> 5 Temporary Erosion& LS 1 $27,613.00 $27,613.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 $40,000.00 $40,000.00 $50,000.00 $50,000.00 <br /> Sedimentation Control <br /> 6 Temporary Silt Fence LF 450 57.12 $3,204.00 $10.00 $4,500.00 $5.00 $2,250.00 $8.00 $3,600.00 $5.00 $2,250.00 <br /> 7 Construction Limit Fence LF 1,260 $3.80 $4,788.00 $18.00 $22,680.00 $4.00 $5,040.00 $10.00 $12,600.00 $3.00 $3,780.00 <br /> 8 Furnish Steel Pipe Piles LF 15,480 $96.00 $1,486,080.00 $61.00 $944,280.00 $75.00 $1,161,000.00 $69.00 $1,068,120.00 $65.00 $1,006,200.00 <br /> 9 Install Steel Pipe Piles EA 170 $3,793.00 $644,810.00 $3,500.00 $595,000.00 $2,300.00 $391,000.00 $4,000.00 $680,000.00 $3,600.00 5612,000.00 <br /> }--•'`�' <br /> 10 Elevated Pile Cap-Type V EA 85 $6,588.00 $559,980.00 $4,300.00 $365,500.00 $5,200.00 $442,000.00 $6,733.00 $572,305.00 $9,500.00 5807,500.00 <br /> N <br /> 11 Elevated 48"Dia.Pipleine No.3 LF 3,813 $571.00 $2,177,223.00 $500.00 $1,906,500.00 $460.00 $1,753,980.00 $394.00 $1,502,322.00 • $425.00 $1,620,525.00 <br /> 12 Restrained Expansion Coupling EA 7 $11,832.00 $82,824.00 $20,000.00 $140,000.00 $23,000.00 $161,000.00 $25,000.00 $175,000.00 S20,000.00 $140,000.00 <br /> 13 Mechanical Expansion Joint EA I $26,575.00 $26,575.00 $60,000.00 $60,000.00 $22,000.00 $22,000.00 $20,000.00 $20,000.00 $18,500.00 $18,500.00 <br /> 14 Elevated Walkway-Pipeline No. LF 3,820 $279.00 $1,065,780.00 $120.00 $458,400.00 $166.00 $634,120.00 $220.00 .$840,400.00 $195.00 $744,900.00 <br /> 4 <br /> 15 Access Manway EA 4 $13;675.00 $54,700.00 $10,300.00 $41,200.00 $11,000.00 $44,000.00 $12,180.00 $48,720.00 $10,000.00 540,000.00 <br /> 6 <br /> 16 Air-Vacuum/Air Release Valve EA 1 $10,672.00 $10,672.00 $13,500.00 $13,500.00 $16,000.00 $16,000.00 $24,000.00 $24,000.00 $25,000.00 $25,000.00 s <br /> Assembly <br />