Laserfiche WebLink
• <br /> BID TABULATION <br /> Replacement of Water Transmission Line No.3,Phase 7 <br /> W.O.#UP 3437-4 <br /> Date 5/11/2011 • <br /> Prepared By:William Barrett <br /> For:Souheil Nasr,Project Engineer ENGINEER'S ESTIMATE Quest Civil Constructors American Construction Don Kelly Construction Tri-State Construction <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> # ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> 17 Connection to Existing Elevated EA 2 $12,830.00 $25,660.00 $8,000.00 $16,000.00 $46,000.00 $92,000.00 $10,000.00 $20,000.00 $25,000.00 $50,000.00 <br /> 48"Dia.Steel Pipe <br /> 18 Electrical Continuity Bonding EA 85 $545.00 $46,325.00 $145.00 $12,325.00 $120.00 $10,200.00 $145.00 $12,325.00 $200.00 $17,000.00 <br /> 19 Remove&Dispose/Salvage LS 1 $122,696.00 $122,696.00 $150,000.00 $150,000.00 $110,000.00 $110,000.00 $130,000.00 $130,000.00 $200,000.00 5200,000.00 <br /> Existing Pipeline No.3 <br /> 20 Remove&Dispose/Salvage LS I $163,672.00 $163,672.00 $165,260.00 $165,260.00 $400,000.00 $400,000.00 $270,000.00 $270,000.00 $175,000.00 $175,000.00 <br /> Existing Creosote Pile Support <br /> 21 Hydroseed-Seed Mix 1 Acre 1.0 $2,344.00 $2,344.00 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 <br /> 22 Hydroseed-Seed Mix 2 Acre 5.0 $2,344.00 $11,720.00 $1,200.00 $6,000.00 $1,200.00 $6,000.00 $1,300.00 $6,500.00 $975.00 $4,875.00 I <br /> 23 Traffic Control Plan& LS 1 $44,362.00 $44,362.00 $13,000.00 $13,000.00 $7,000.00 $7,000.00 $52,000.00 $52,000.00 $100,000.00 $100,000.00 <br /> Maintenance <br /> 24 Traffic Control Labor Hour 800 $55.00 $44,000.00 $40.00 $32,000.00 $50.00 $40,000.00 $46.00 $36,800.00 $52.00 $41,600.00 <br /> 251__$ecord Drawings LS 1 $5,520.00 $5,520.00 $1,500.00 $1,500.00 $5,000.00 $5,000.00 $12,600.00 $12,600.00 $5,000.00 $5,000.00 <br /> 26(dyibration&Settlement LS 1 $136,581.00 $136,581.00 $44,200.00 $44,200.00 $40,000.00 $40,000.00 $43,150.00 $43,150.00 $25,000.00 $25,000.00 <br /> Monitoring <br /> 27 Additional Steel Pipe Pile Splice EA 85 $555.00 $47,175.00 $483.00 $41,055.00 $1,700.00 $144,500.00 $500.00 $42,500.00 5475.00 $40,375.00 <br /> 28 Furnish Additional Steel Pipe LF 1,550 $76.00 $117,800.00 $62.00 $96,100.00 $85.00 $131,750.00 $65.00 $100,750.00 $61.00 $94,550.00 <br /> Pile Length <br /> Base Bid $7,823,661.00 $5,851,500.00 $6,155,840.00 $6,275,192.00 $6,326,555.00 <br /> Sales Tax8.6% $672,834.85 $503,229.00 $529,402.24 $539,666.51 $544,083.73 <br /> Contract Totals: 58,496,495.85 $6,354,729.00 $6,685,242.24 $6,814,858.51 $6,870,638.73 <br /> (V <br /> Fes► <br />