Laserfiche WebLink
3. Landfill Pad North of 41" Street: All -Weather Surface / Com action. The final <br />three sentences of Section 22.e of the Third Amendment are hereby deleted and replaced with the <br />following: <br />Except as otherwise provided in this Section 22.e, any fill material shall be compacted in <br />accordance with the Grading/Surcharge Plans, including any surcharge materials that <br />remain on the Landfill Pad following surcharge activities. Except in the areas marked as <br />"6 -Inch Thick All -Weather Surface" or "No All -Weather Surface" on Attachment A to <br />this Fifth Amendment, the upper 18 inches of soil at the finished grade following <br />surcharge shall be of all-weather surface and to a 95% compaction standard. This upper <br />18 inches of soil may be cement augmented in order to achieve the all-weather and 95% <br />compaction standards. <br />The area marked as "6 -Inch Thick All -Weather Surface" in the attachment to the Fifth <br />Amendment will be of all-weather surface. The City will use the same methods of <br />compaction (including cement augmentation) in the "6 -Inch Thick All -Weather Surface" <br />area as the City uses in the areas of the Landfill Pad that are compacted to a 95% <br />compaction standard, but the City does not guarantee that the "6 -Inch Thick All -Weather <br />Surface" area will meet a 95% compaction standard. The City has no obligation to use <br />additional compaction methods in the "6 -Inch Thick All -Weather Surface" area. <br />4. Landfill Pad Lot 16: Grading, Fill and Surcharge. <br />a. Grading, Fill and Surcharge. Developer and City acknowledge that they <br />have agreed to the following regarding grading, fill, and surcharge on that certain portion of the <br />Landfill Pad south of 41" Street and more specifically identified as Lot 16 (the "Parcel"): <br />The City shall complete all grading, filling, and surcharging of the Parcel, including <br />clearing and grubbing. The amount of that fill material shall be approximately 230,000 <br />yards, and the fill material shall be placed and compacted in accordance with Everett <br />Riverfront Surcharge Phase #3 Project Plans dated April 9, 2010. Upon completion of <br />City's work on the Parcel in conformance with this Section 4.a: (i) except for organic <br />surcharge material as described in Section 4.b below, Developer shall own all fill and <br />surcharge material on the Parcel and (ii) except for any City obligations regarding <br />hazardous materials that may be contained in the PDA or other agreements between the <br />City and Developer, City shall have no further obligations regarding fill and surcharge <br />material on the Parcel. <br />b. Removal of Organic Surcharge Material. The City shall remove <br />approximately 10,000 yards of organic surcharge material from the Parcel by the earlier of <br />(i) June 30, 2012 or (ii) the commencement date of surcharge removal on the Parcel by <br />Developer. <br />-4-5 <br />