5. Agreed Additional City Work on Landfill Pad. The City shall complete the work <br />listed on Attachment B to this Fifth Amendment no later August 31, 2011. <br />6. Mill Site: Second Amendment to Amended KLB License. <br />a. Amendment to Scope of Work Required Under Amended KLB License. <br />City and Developer agree that the Amended KLB License, a copy of which is attached as <br />Exhibit F to the Third Amendment, may be further amended by the parties thereto as follows: <br />Subsections IV. 3. C(2) through C(5) of the Amended KLB License shall be deleted and <br />replaced with the following sections with all work to be completed no later than August 31, <br />2011: <br />C(2) KLB shall place on the Mill Site a minimum 2 -foot thick layer of <br />Structural Fill or Site Grading Fill (approximately 50,000 cu yds +/-) or 2 -foot - <br />thick layer of Cement Stabilized Soil to an elevation not less than on average two <br />feet above the 100 -Year Flood Elevation. Structural Fill or Site Grading Fill shall <br />be placed in maximum 12 -inch horizontal loose lifts and compacted to at least <br />95% of its maximum dry density as determined by test method ASTM D 1557 <br />(Modified Proctor). The Cement -Stabilized Soil shall be evenly spread in 12 -inch <br />maximum lifts and thoroughly mixed using appropriate soil -cement mixing <br />equipment, as approved by the City, such that the amended soil may be <br />compacted to at least 95% of the maximum dry density (Modified Proctor). <br />C(3) Following completion of the work described in Subsections <br />IV.3.C.(1) and (2), all material existing on the Mill Site must be cut down so that <br />such material is about one (1) foot below the grade shown on the grading plan <br />dated June 11, 2010, by Magnusson Klemencic Associates. <br />C(4) After cutting down such excess material, exposed subgrade must <br />be proof -rolled with. a loaded haul truck or scraper. GeoEngineers and/or OM <br />must be notified prior to proof -rolling. Identified soft areas must be removed and <br />replaced with suitable processed Structural Fill, as reasonably approved by <br />Developer. <br />C(5) After proof -rolling and removing or repairing any soft subgrade <br />areas, the exposed subgrade must be compacted to at least 95 percent of the <br />maximum dry density per ASTM D 1557. <br />C(6) After such subgrade compaction, cap material must be placed on <br />the subgrade and compacted to at least 95 percent of the maximum dry density per <br />ASTM D 1557. The cap material must consist of 3 -inch minus screened recycled <br />crushed concrete uniformly blended with the sand that is stockpiled on the site. <br />Metal, wire, rebar and other deleterious debris must be removed from the cap fill <br />material. After compaction, the cap material must be at least 12 inches thick and <br />may be as thick as 16 inches. <br />6 <br />-5- <br />