Laserfiche WebLink
7 <br /> CERTIFICATE OF COMPLETION <br /> Project: Replacement of Water Transmission Lines 2 and 3,Phase 6 <br /> Contractor: Tri-State Construction <br /> Work Order No. UP 3141 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> /1// I .Public ,4orks i -ctor Date <br /> Dave Davis <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br /> Attest: <br /> City Clerk <br /> Sharon Marks <br /> APPROVED AS TO FORM <br /> By: <br /> Jim Iles, City Attorney <br /> Date <br /> 45 <br />